000 01477cam a22003374a 4500
001 12432877
003 KEPU
005 20170314115503.0
008 010606s2002 maua 001 0 eng
010 _a 2001041039
020 _a0072435801 (alk. paper)
040 _aDLC
_cDLC
_dDLC
042 _apcc
043 _an-us---
050 0 0 _aTH435
_b.P47 2002
100 1 _aPeurifoy, R. L.
_q(Robert Leroy),
_d1902-1995.
_911731
245 1 0 _aEstimating construction costs /
_cRobert L. Peurifoy, Garold D. Oberlender.
250 _a5th ed.
260 _aBoston :
_bMcGraw-Hill,
_cc2002.
300 _axvi, 560 p. :
_bill. ;
_c25 cm.
440 4 _aThe McGraw-Hill series in construction engineering and project management
_932687
500 _aIncludes index.
650 0 _aBuilding
_xEstimates
_zUnited States.
_932688
700 1 _aOberlender, Garold D.
_932689
856 4 2 _3Publisher description
_uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-d.html
856 4 1 _3Table of contents only
_uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-t.html
856 4 2 _3Contributor biographical information
_uhttp://www.loc.gov/catdir/enhancements/fy0735/2001041039-b.html
906 _a7
_bcbc
_corignew
_d1
_eocip
_f20
_gy-gencatlg
942 _2lcc
_cBK
_hTH435
_i.P47 2002
999 _c114174
_d114174