Glazed Panel Construction with Human-Robot Cooperation (Record no. 106288)

000 -LEADER
fixed length control field 04026nam a22004815i 4500
001 - CONTROL NUMBER
control field 978-1-4614-1418-6
003 - CONTROL NUMBER IDENTIFIER
control field DE-He213
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20140220083733.0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field cr nn 008mamaa
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110919s2011 xxu| s |||| 0|eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781461414186
-- 978-1-4614-1418-6
024 7# - OTHER STANDARD IDENTIFIER
Standard number or code 10.1007/978-1-4614-1418-6
Source of number or code doi
050 #4 - LIBRARY OF CONGRESS CALL NUMBER
Classification number Q334-342
050 #4 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TJ210.2-211.495
072 #7 - SUBJECT CATEGORY CODE
Subject category code UYQ
Source bicssc
072 #7 - SUBJECT CATEGORY CODE
Subject category code TJFM1
Source bicssc
072 #7 - SUBJECT CATEGORY CODE
Subject category code COM004000
Source bisacsh
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 006.3
Edition number 23
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Lee, Seungyeol.
Relator term author.
245 10 - TITLE STATEMENT
Title Glazed Panel Construction with Human-Robot Cooperation
Medium [electronic resource] /
Statement of responsibility, etc by Seungyeol Lee.
264 #1 -
-- New York, NY :
-- Springer New York,
-- 2011.
300 ## - PHYSICAL DESCRIPTION
Extent X, 70p. 60 illus.
Other physical details online resource.
336 ## -
-- text
-- txt
-- rdacontent
337 ## -
-- computer
-- c
-- rdamedia
338 ## -
-- online resource
-- cr
-- rdacarrier
347 ## -
-- text file
-- PDF
-- rda
490 1# - SERIES STATEMENT
Series statement SpringerBriefs in Computer Science,
International Standard Serial Number 2191-5768 ;
Volume number/sequential designation 8
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note Introduction -- Control Algorithm for Human-Robot Cooperation -- Conceptual Design of Human-Robot Cooperative System -- Prototype for Glazed Panel Construction Robot -- Glazed Ceiling Panel Construction Robot -- Conclusion and Future works.
520 ## - SUMMARY, ETC.
Summary, etc These days, construction companies are beginning to be concerned about a potential labor shortage by demographic changes and an aging construction work force. Also, an improvement in construction safety could not only reduce accidents but also decrease the cost of the construction, and is therefore one of the imperative goals of the construction industry. These challenges correspond to the potential for Automation and Robotics in Construction as one of solutions. Almost half of construction work is said to be material handling and materials used for construction are heavy and bulky for humans. To date, various types of robots have been developed for glazed panel construction. Through the case studies on construction, to which the robots were applied, however, we identified difficulties to be overcome. In this study, a human-robot cooperative system is deduced as one approach to surmount these difficulties; then, considerations on interactions among the operator, robot and environment are applied to design of the system controller. The human-robot cooperative system can cope with various and construction environments through real-time interaction with a human, robot and construction environment simultaneously. The physical power of a robot system helps a human to handle heavy construction materials with a relatively scaled-down load. Also, a human can feel and respond to the force reflected from robot end effecter acting with working environment. Through the experiments and mock-up tests with a prototype robot, we observe the characteristics of the power assist and the force reflection, the merits of the human-robot cooperation system. To apply human-robot cooperative system at real construction sites, Glazed Ceiling Panel Construction Robot is developed for the first time. This robot is distinguished from other glazed panel construction robots because of the methods of lifting the panel to high installation positions and installing the fragile and bulk panel with robot force control. After applying to real construction sites, evaluation on the productivity of the developed robot was done by comparing and analyzing with the existing installation methods.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Computer science.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Artificial intelligence.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Mechanical engineering.
650 14 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Computer Science.
650 24 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Artificial Intelligence (incl. Robotics).
650 24 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Mechanical Engineering.
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element SpringerLink (Online service)
773 0# - HOST ITEM ENTRY
Title Springer eBooks
776 08 - ADDITIONAL PHYSICAL FORM ENTRY
Display text Printed edition:
International Standard Book Number 9781461414179
830 #0 - SERIES ADDED ENTRY--UNIFORM TITLE
Uniform title SpringerBriefs in Computer Science,
-- 2191-5768 ;
Volume number/sequential designation 8
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier http://dx.doi.org/10.1007/978-1-4614-1418-6
912 ## -
-- ZDB-2-SCS

No items available.

2017 | The Technical University of Kenya Library | +254(020) 2219929, 3341639, 3343672 | library@tukenya.ac.ke | Haile Selassie Avenue